A view of the road and canal network
November 6, 2018A view of the road and canal network in the city
29 -
A view of Eko Boulevard
November 6, 2018A view of Eko Boulevard, an 8 lane boulevard, 1,500m long, the focal point of the Business District is...
-
A view of the road network
November 6, 2018A view of the road network and foliage in Eko Atlantic City
-
Viewed from the east
November 6, 2018Viewed from the east, the development of the 3 Azuri Peninsula towers on the right, two Eko Pearl towers...
-
-
A section of the canal completed
June 25, 2018The expressway on the south side (on the right of the picture) has been completed, while the north side...
-
Azuri Peninsula construction progress
June 25, 2018A night image of the 3 towers of Azuri Peninsula under construction.
-
-
ENTRANCES AND EXITS TO CANALS COMPLETED
August 21, 2017The entrances and exits to the Canals are now complete. Drivers will be able to access the East and...
-
GREAT WALL PROMENADE CONSTRUCTION PROGRESS
August 21, 2017The Promenade, being built atop The Great Wall of Lagos, is ever growing. The promenade is the final step...
-
LANDSCAPING ON ROADS ADJACENT TO EKO ENERGY ESTATE
August 21, 2017The roads and landscaping adjacent to the Eko Energy Estate are now complete with landscaping. This section of the...
-
AVENUE 3 PAVING PROGRESS
August 21, 2017Avenue 3, which separates Eko Atlantic Phase 2 from Phase 3, is currently being paved. This Road can be...
-
Finished section of the Eko Boulevard
August 20, 2016Looking southwest at a finished section of the Eko Boulevard, on the left, and Access 1 road (temporary designation),...
-
Underground storm drainage pipes
August 20, 2016Underground storm drainage pipes prepared for installation under a future road.
-
Bridge of Avenue 3
August 20, 2016Standing on the Bridge of Avenue 3, looking west, the progress of the Canal can be seen below. Sheet...
-
Bridge 10
August 20, 2016Bridge 10 completed to deck level. It will soon have bridge boundaries installed along the path of the iron...
-
-
Road progress: Avenue 2
June 10, 2016Road progress: Avenue 2, Eko Boulevard and Avenue 1, underpasses
-
Completed roads June 2016
June 10, 2016Completed roads: Avenue 1 (left), Eko Boulveard (centre), Avenue 2 (right). Other roads featured in this photograph: Oceanside Road,...
-
Casting the abutments for Bridge 15
May 25, 2016Casting the abutments for Bridge 15, near the Lagos Channel
-
-
-
-
The first row of street lights along Avenue 1
April 3, 2015The first row of street lights along Avenue 1, the paved 6-lane thoroughfare that is over one and a...
-
ROAD SURFACE ON BRIDGE 7
January 13, 2015Another important landmark has been achieved by casting in concrete and putting into position the road surface or decking...
-
FIRST ROAD LIGHTING
December 24, 2014As the new Eko Atlantic cityscape starts to take shape by day there is something new to see at...
-
AVENUE 2 UP TO STONE BASE LEVEL
December 10, 2014Avenue 2, a road artery that is located east of Eko Boulevard, the spine of the Business District of...
-
AFREN PLC TOWER
August 18, 2014Construction of the 15 floor Afren PLC building is well underway with eight out of 15 levels built by...
-
WATER-BASED UTILITIES
August 7, 2014The water, sewage and storm drains for Eko Atlantic are a groundbreaking undertaking for Lagos. Currently, there are no...
-
BRIDGES
August 7, 2014Construction work is currently under way on six bridges. Bridge 7 on Avenue 1, directly west of Eko Boulevard,...
-
PAVING
August 7, 2014To date, pre-cast concrete paving blocks have been laid on Eko Boulevard stretching over 420 metres in length. At...
-
EKO ATLANTIC WATERWAY
August 7, 2014The arrival of the sheet piles for the first section of Eko Atlantic’s waterway; furthermore the specialist rig required...