Project Updates

  • Finished section of the Eko Boulevard

    August 20, 2016

    Looking southwest at a finished section of the Eko Boulevard, on the left, and Access 1 road (temporary designation),...

    18
  • Underground storm drainage pipes

    August 20, 2016

    Underground storm drainage pipes prepared for installation under a future road.

    7
  • Bridge of Avenue 3

    August 20, 2016

    Standing on the Bridge of Avenue 3, looking west, the progress of the Canal can be seen below. Sheet...

    14
  • Bridge 10

    August 20, 2016

    Bridge 10 completed to deck level. It will soon have bridge boundaries installed along the path of the iron...

    2
  • Eko Atlantic seen from the air

    June 10, 2016

    Eko Atlantic seen from the air.

    3
  • Road progress: Avenue 2

    June 10, 2016

    Road progress: Avenue 2, Eko Boulevard and Avenue 1, underpasses

    2
  • Completed roads June 2016

    June 10, 2016

    Completed roads: Avenue 1 (left), Eko Boulveard (centre), Avenue 2 (right). Other roads featured in this photograph: Oceanside Road,...

    1
  • Casting the abutments for Bridge 15

    May 25, 2016

    Casting the abutments for Bridge 15, near the Lagos Channel

    3
  • Casting of Bridge 10

    April 25, 2016

    Casting of Bridge 10, seen from above.

    1
  • Avenue 2 completed

    April 25, 2016

    Avenue 2 completed.

    2
  • Southern underpass completed

    April 25, 2016

    Southern underpass completed.

    2
  • The first row of street lights along Avenue 1

    April 3, 2015

    The first row of street lights along Avenue 1, the paved 6-lane thoroughfare that is over one and a...

    2
  • ROAD SURFACE ON BRIDGE 7

    January 13, 2015

    Another important landmark has been achieved by casting in concrete and putting into position the road surface or decking...

    3
  • FIRST ROAD LIGHTING

    December 24, 2014

    As the new Eko Atlantic cityscape starts to take shape by day there is something new to see at...

    3
  • AVENUE 2 UP TO STONE BASE LEVEL

    December 10, 2014

    Avenue 2, a road artery that is located east of Eko Boulevard, the spine of the Business District of...

    2
  • AFREN PLC TOWER

    August 18, 2014

    Construction of the 15 floor Afren PLC building is well underway with eight out of 15 levels built by...

    1
  • WATER-BASED UTILITIES

    August 7, 2014

    The water, sewage and storm drains for Eko Atlantic are a groundbreaking undertaking for Lagos. Currently, there are no...

    1
  • BRIDGES

    August 7, 2014

    Construction work is currently under way on six bridges. Bridge 7 on Avenue 1, directly west of Eko Boulevard,...

    1
  • PAVING

    August 7, 2014

    To date, pre-cast concrete paving blocks have been laid on Eko Boulevard stretching over 420 metres in length. At...

    3
  • EKO ATLANTIC WATERWAY

    August 7, 2014

    The arrival of the sheet piles for the first section of Eko Atlantic’s waterway; furthermore the specialist rig required...

    4